Gasport
Installation of the worlds first 100 barg rated ship to shore HP gas unloading arm and downstream gas metering and treatment systems which were subsequently connected to the national grid via a buried delivery pipeline.
Marine Developer
To meet new International Maritime Organisation rulings being introduced from 2012, vessels travelling within 200 nautical miles of shore will need to cut their fuel sulphur content by 98%.
Perenco
OSL undertook a study, for the client, with the aim of investigating ways of rationalising their Southern North Sea gas production infrastructure. The objective of this study was to look at ways of reducing operational expenditure and increase returns, with declining field reserves.
Oando
OSL were requested by the largest independent Oil and Gas company in Nigeria to develop a viable technical solution for a large (7600t) LPG receiving, storage and loading facility on a brown field site on the outskirts of Lagos.
BP South Gas Assets
BP require an offshore produced water treatment facility for one of their Southern North Sea platforms. A gas well connected to this platform cannot flow as it has significantly high water content and cannot be treated at the onshore terminal.
Skaugen
IM Skaugen (IMS) already used their smaller Multigas Ships for Liquid Petroleum Gas (LPG) and wanted to also enter the Liquid Natural Gas business (LNG).
Total
Total had a problem at their Immingham refinery with contaminants in the Liquid Petroleum Gas (LPG) product stream. A plant was required that could remove these using absorbents.