Thumb_gasport-1

Gasport

Installation of the worlds first 100 barg rated ship to shore HP gas unloading arm and downstream gas metering and treatment systems which were subsequently connected to the national grid via a buried delivery pipeline.

Read more


Thumb_marine_developers-1

Marine Developer

To meet new International Maritime Organisation rulings being introduced from 2012, vessels travelling within 200 nautical miles of shore will need to cut their fuel sulphur content by 98%.

Read more


Thumb_perenco-1

Perenco

OSL undertook a study, for the client, with the aim of investigating ways of rationalising their Southern North Sea gas production infrastructure. The objective of this study was to look at ways of reducing operational expenditure and increase returns, with declining field reserves.

Read more


Thumb_oando-1

Oando

OSL were requested by the largest independent Oil and Gas company in Nigeria to develop a viable technical solution for a large (7600t) LPG receiving, storage and loading facility on a brown field site on the outskirts of Lagos.

Read more


Thumb_bp

BP South Gas Assets

BP require an offshore produced water treatment facility for one of their Southern North Sea platforms. A gas well connected to this platform cannot flow as it has significantly high water content and cannot be treated at the onshore terminal.

Read more


Thumb_skaugen

Skaugen

IM Skaugen (IMS) already used their smaller Multigas Ships for Liquid Petroleum Gas (LPG) and wanted to also enter the Liquid Natural Gas business (LNG).

Read more


Thumb_total

Total

Total had a problem at their Immingham refinery with contaminants in the Liquid Petroleum Gas (LPG) product stream. A plant was required that could remove these using absorbents.

Read more